




MA Group is a Dubai design, construction and fit-out group of three licensed companies — interiors, contracting and maintenance — under one owner. The team that draws your building is the team that builds it and the team that maintains it, so a defect never becomes an argument between two contractors.
A building changes hands twice in its first year — from designer to contractor, and from contractor to whoever maintains it. Both handovers are where accountability leaks. We hold all three stages under one ownership, so there is nobody to hand the problem to.
Architectural and interior design, shop drawings, MEP coordination and the authority submissions that go with them — Dubai Municipality, Civil Defence, DEWA and the free-zone authorities. The drawings we issue are the drawings we build to.
Main-contract construction, interior fit-out, landscape, external works and swimming pools. We self-perform the trades that decide the finish rather than sub-letting them.
Planned and reactive maintenance after handover, on published response times, in our own client portal. The team that built the asset is the team that keeps it running.
Most projects in Dubai are assembled from a designer, a fit-out contractor and, later, a maintenance company that has never seen the building. Each is paid separately and each is entitled to blame the one before.
Under one group, the same drawings, the same site team and the same asset register run from the first sketch to year ten. When something fails in month eighteen we already hold the shop drawing, the material record and the name of the person who installed it.
There is no investigation to open and no second contractor to appoint. That is the whole reason the three licences sit under one owner — it is a structure built for the client’s benefit, not a convenience for us.
A main contractor who sub-lets everything is a broker with a licence. These are the trades carried out by MA Group employees, on our own payroll, under our own supervision — which is why the finish and the programme stay ours to answer for.
Setting out, blockwork, render and screed
Wall cladding, flooring, thresholds and polishing
Cut, assembled and installed by our own fitters
Column and slab formwork, falsework, rebar and pours
Preparation, spray and specialist wall finishes
Sanitaryware, ironmongery, accessories and our own snag list
Every contractor in this market offers a twelve-month defects liability period, because the contract obliges them to. Almost none are still reachable in year three — maintenance is a different company, with a different licence and no memory of your building.
Our founder ran facility management for Dubai Silicon Oasis Authority for thirteen years before starting this group — across buildings other people had built and then left. MA Group is organised around that experience. We hold the maintenance licence, we keep the asset register, the warranties and the O&M manuals, and we publish the response times we will be judged on.
Each division can be engaged on its own. Most clients start with one and finish using three — which is the point of keeping them under one owner.
Turnkey interiors for offices, hospitals, clinics, restaurants, hotels, retail and villas. We take the brief, produce the design package, price it as a bill of quantities, build it, and snag our own work.

Main-contract construction: new builds, extensions, modular buildings, structural and civil works, and the authority submissions that go with them.

Planned and reactive maintenance after handover — run through our own client portal, so every request, visit and invoice is on the record.

Joinery and carpentry carried out by our own team — reception counters, wardrobes, kitchens, wall panelling and display units, cut and assembled by our fitters instead of bought in from a third party.

Pool structure, waterproofing, tiling and finishes, filtration and circulation plant, lighting, decking and the landscape around it — under the same contract as the building.
External works from planting and irrigation through to interlock paving, planter walls, car parks and external lighting.

Our own system, built in-house — not a subscription we resell. Every maintenance client gets an account on handover.
| Request | Raised | Status |
|---|---|---|
| Chiller 02 — low output | Today 09:14 | On site |
| Ward 3 door closer | Yesterday | Scheduled |
| Quarterly PPM — AHU | 02/09/2026 | Closed |
| Reception joinery touch-up | 28/08/2026 | Closed |
Every space in the films below is a completed MA Group project, filmed after handover. No renders, no library clips, no other contractor’s work.
We keep a photographic record of every project from first site visit to handover. Tell us the sector you are procuring for and we will send the relevant set — drawings, specification and finished photography.
Filter by sector. Every project below has a named client and a documented scope — there is no round number standing in for a portfolio.

Healthcare fit-out · Jebel Ali

Grand Hyatt · Oud Metha

Al Wasel project · Dubai

Private client · Nad Al Sheba

Healthcare renovation · Al Qusais

DeCarlo · Silicon Oasis

MA Group · Nadd Al Hamar

Aster Pharmacy · Dubai Investment Park
Written plainly, so you can check where we stand before you call. If your question is not here, send it — we reply in writing within one working day.
A fit-out contractor turns a bare or shell-and-core unit into a finished, occupiable space — partitions, ceilings, flooring, joinery, MEP services and finishes. In Dubai the contractor also carries the authority approvals: Dubai Municipality or the relevant free-zone authority, Civil Defence for fire and life safety, and DEWA for power and water connections.
Most Dubai fit-outs need fit-out approval from the authority governing the plot — Dubai Municipality, DDA, Trakhees, DMCC or another free zone — plus Civil Defence approval for fire alarm, suppression and means of escape, and DEWA approval where power, water or drainage change. The landlord’s NOC comes first.
Approval depends on the plot. Dubai Municipality governs most mainland areas; Trakhees covers Jebel Ali and Palm Jumeirah; DDA covers Dubai Design District and the TECOM communities; DMCC, Dubai Silicon Oasis and other free zones govern their own plots. Civil Defence approves fire and life safety everywhere, and DEWA approves utility connections.
Shell and core is a bare structural envelope with base building services only. Cat A adds the landlord’s finish — raised floors, suspended ceilings, basic lighting and HVAC — making a lettable but unoccupiable space. Cat B is the tenant’s own fit-out: layout, partitions, joinery, branding and everything the occupier actually uses.
A fit-out completes a space that has never been occupied, working from a shell or a landlord’s Cat A finish. A refurbishment replaces or upgrades an existing finished space, which means demolition, protecting what stays, working around live services, and usually working around people still using the building.
Yes, and it is a different discipline from an empty shell. Live-environment work is phased around the operating timetable with sealed hoardings, controlled access, dust and infection-control measures, and noisy activities restricted to agreed windows. The method statement is agreed with the facility’s operations team before any work starts.
The contractor carries the defects liability period stated in the contract — commonly twelve months from handover — covering workmanship and materials, but not fair wear or misuse. Under UAE law, contractors and designers also carry a ten-year decennial liability for structural collapse or defects threatening the building’s stability.
A defects liability period is the window after practical completion during which the contractor must return and correct defects in workmanship or materials at their own cost. Twelve months is standard in UAE fit-out and construction contracts. It is a contractual obligation, separate from any manufacturer warranty on installed equipment.
Both. MA Group works as main contractor holding the full scope and the authority approvals, and as a specialist subcontractor to other main contractors on interiors, joinery, landscape and finishing packages. The licences held are Marvellous Art (licence 1175355) for interiors and MA Building Contracting (licence 1313110) for construction.
Fit-out is priced as a bill of quantities — measured quantities against unit rates, with preliminaries and overheads carried inside the rates rather than shown as separate lines. UAE VAT of 5% is added to the contract sum and shown separately on each invoice and payment certificate.
A bill of quantities lists every item with its measured quantity, unit, unit rate and total, grouped by trade and referenced to the drawings and specification. Preliminaries and overheads belong inside the unit rates. Provisional sums and prime cost items are identified separately, so the client can see what is not yet fixed.
We do, if you want us to. MA Group holds a building maintenance licence alongside the interiors and contracting licences, so planned and reactive maintenance runs under the same ownership as the build. You get the asset register, the warranties and the O&M manuals, and a named engineer who worked on the project.
| Measure | Commitment |
|---|---|
| Enquiry response | 1 working day |
| Emergency callout — attendance | 4 hours |
| Urgent callout — attendance | 24 hours |
| Routine callout — attendance | 3 working days |
| Snag closure after handover | 14 days |
| Defects liability period | 12 months |
Most contractors in this market publish no names at all. For a business selling accountability, that is a contradiction — so we do the opposite.
Architectural engineer. Thirteen years running facility management for Dubai Silicon Oasis Authority before founding MA Group — which is why this group is built around what happens after handover, not just up to it.
Every project has a named engineer and a named site manager, and you get both on day one. If something goes wrong, you already know who is picking up the phone.
As main contractor or specialist subcontractor. Reference letters available on request.






























Three ways in. A group that is hiring across all three is a group that is growing. MA Group staff and the HR team sign in on the careers page.
Engineers, quantity surveyors, project managers, designers and FM supervisors.
Submit your CV online Skilled tradesJoiners, machinists, finishers, electricians, plumbers and technicians for our sites.
Submit your CV online Subcontractors & suppliersRegister your company, upload your trade licence and get on our tender list. We reply within three working days.
Register your companyDon't work out which of our companies you need. Describe the job and we route it internally. We reply within one working day, in writing.
Al Basha Plaza, Office 101, 9th Street, Nadd Al Hamar, Dubai — open in Google Maps
