Hospitality and F&B

A restaurant is judged in the first ten seconds and a hotel is judged by guests who are still staying there while you work. Hospitality fit-out is finish-critical and reputation-critical at the same time.

In hospitality the opening date is fixed before the contract is signed — the bookings are taken, the staff are hired and the marketing is out. The programme has no float, and the finish still has to survive commercial use from the first day.

What makes hospitality fit-out different?

The finish tolerance and the fixed opening date. Guests read a restaurant or a lobby in seconds, so joinery, stone and decorative finishes carry the whole impression. And the date cannot move — the bookings, the staff and the marketing are already committed before the contract starts.

Can you work inside an operating hotel?

Yes. Work in an operating hotel is phased and hoarded, with access, deliveries and waste routed away from guest circulation, and noisy activities restricted to agreed windows. The method statement is agreed with the hotel's operations team before mobilisation.

Which hospitality projects has MA Group delivered?

The restaurant and bar at Grand Hyatt Dubai in Oud Metha, and DeCarlo Gourmet in Silicon Oasis, alongside hotel public areas and back-of-house work. Reference letters are available on request.

Who does the joinery on a restaurant fit-out?

Our own team. Bars, service counters, banquette frames, panelling and display units are drawn, cut, assembled and installed by MA Group, which is why a late design change becomes a site instruction rather than a re-tender with a third-party supplier.

How do you protect a finished area before opening?

Completed areas are sealed, protected and locked down as they finish, with a controlled snag and touch-up sequence immediately before handover. On a fixed opening date the risk is not finishing late — it is damaging finished work while completing the areas around it.

The facts
DeliveredGrand Hyatt Dubai, Oud Metha · DeCarlo Gourmet, Silicon Oasis
Typical scopeDining halls, bars, lobbies, guest rooms, back of house, washrooms
Finish-critical tradesMarble and large-format tiling, joinery, decorative finishes — all self-performed
Live-environment workPhased possession and out-of-hours works inside operating hotels
CertifiedISO 9001, 14001 and 45001 across all three companies, LEMS, valid to 30/06/2027
After handover12-month defects liability, then maintenance under our own licence
Delivered by Marvellous Art Decoration Design & Fit Out Co. L.L.C (licence 1175355), M A For Building Contracting Co. L.L.C (licence 1313110) and M.A For Building Maintenance Co. L.L.C (licence 1447896) · all DET Dubai
Also relevant
Services on this kind of project

Tell us about the project.

Describe the job and we route it internally — you do not have to work out which of our companies you need. We reply within one working day, in writing.

Chat with us